Daria LLC is the one-stop-solution for all your engineering needs. We have been actively involved
in most modern and highly important projects throughout Georgia since 2010.
| Year | Client | Project | Scope of Services | Location |
|---|---|---|---|---|
| 2023-2024 | Aqualia GWP | Construction of Water Pump Station and Q=5000m³ Water Reservoir for Tabakhmela Region of Tbilisi | Construction of Water Supply Pipeline & Pumping Station | Tbilisi Municipality |
| 2023-2024 | Aqualia GWP | Construction of Water Pump Station near Shvanabada for Mtatsminda Region of Tbilisi | Construction of Water Supply Pipeline & Pumping Station | Gardabani Municipality |
| 2023-2024 | Aqualia GWP | Installation Pumping System and SCADA System near Teleti for Shavnabada Region, Tbilisi | Installation of Pmping System and SCADA System | Gardabani Municipality |
| 2023-2024 | United Georgian Water Supply Company | Construction of Residential Water Supply System with All Ensuing Works for the Town of Vale, Suthern Georgia | Water Supply System with All Ensuing Works | Akhaltsikhe Municipality |
| 2022 | Corporation Sinohydros Branch in Georgia LLC | Relocation of Water and Gas Pipelines under Construction Works for the E-60 Highway Section from Zemo Osiauri to Chumateleti Lot2 (Km 7+700~Km 14+060) under the Project Georgia East West Highway | Water and Gas Pipeline Works | Gardabani Municipality |
| 2021-2022 | Tbilisi City Hall | Construction of 2 Underground Prefabricated Sewer Pumping Stations and Backup Reservoir Q=700m³ for Ivertubani Region of Tbilisi | Construction of Sewer Pumping Stations and Backup Reservoir | Tbilisi Municipality |
| 2020-2021 | Municipality of Tskaltubo | Construction of 23.00km Water Supply Pipeline and Pumping Station in Rioni, Tskaltubo | Construction of Water Supply Pipeline, Pumping Station & Reservoir | Tskaltubo |
| 2020-2021 | Municipality of Tskaltubo | Construction of 23.00km Water Supply Pipeline and Pumping Station in Rioni, Tskaltubo | Construction of Water Supply Pipeline, Pumping Station & Reservoir | Tskaltubo |
Daria LLC is the one-stop-solution for all your engineering needs. We have been actively involved
in most modern and highly important projects throughout Georgia since 2010.
| Year | Client | Project | Scope of Services | Location |
|---|---|---|---|---|
| 2019 | JSC Tam Tbilaviamsheni | Construction of Industrial Type Heating System for Airplane Factory No 31 | Construction of Industrial Heating System | Tbilisi |
| 2019 | JSC Tam Tbilaviamsheni | Construction of Gas Supply Network for Airplane Factory No 31 | Construction of Medium and Low Pressure Gas Pipelines | Tbilisi |
| 2018–2019 | Gardabani Municipality | Construction of Sewerage Network and Pumping Station in Gardabani Municipality, Lelashkha | Construction of Sewerage Network | Gardabani |
| 2018 | Embassy of Lithuania | Cleaning 30000 m² Piece of Land in Khashuri | Site Preparation Works | Khashuri |
| 2017–2020 | Seza Construction Industry and Trade Limited Company | Construction of Gabions and Other Slope Protective Structures Under Construction of Tbilisi-Rustavi Highway Section 2 | Construction of Slope Protective Structures | Tbilisi, Rustavi |
| 2017–2020 | Seza Construction Industry and Trade Limited Company | Relocation Steel Water Pipelines AN Sewerage Networks Alongside the ROW of Tbilisi-Rustavi Highway Section # 2 from DN500 to DN1200 | Reconstruction of Water and Sewerage Pipelines | Tbilisi, Rustavi |
| 2017–2019 | Seza Construction Industry and Trade Limited Company | Relocation Gas Pipelines Alongside the ROW of Tbilisi-Rustavi Highway Section # 2 | Reconstruction of PE and Steel Gas Pipelines | Tbilisi, Rustavi |
| 2017–2018 | Baltic Investment Group LLC | Construction of DN1000 Concrete Drain Pipe in the Canyon and Filling of the Canyon with soil | Construction of Concrete Drain Pipe | Tbilisi |
| 2017 | Tbilisi Municipality | Reconstruction of Geothermic Steel Water Pipeline Section DN300 | Reconstruction Geothermic Steel Water Pipeline | Tbilisi |
| 2016 | Corporation Sinohydros Branch in Georgia LLC | Relocation of High Pressure DN500 Gas Pipeline Alongside the ROW of Tbilisi-Rustavi Highway Sections # 1&3 | Reconstruction of Steel Gas Pipelines | Tbilisi, Rustavi |